Loading Data

Lake Erie & Southern
RiverRail Header Image

Lake Erie & Southern by Ron Copher

Railroad Details
Lake Erie & Southern
Status
active
Scale
HO
Superintendent
Ron Copher
Control
Digitrax
Dispatching
CTC
Communications
Phones
Car Forwarding
Car Cards

Set in mid-1960, the Lake Erie and Southern (LE&S) is a freelance Granger road operating in down-state Illinois.

The modeled LE&S Illinois division includes the 1st district between South Anderson Yard to Alton and St.Louis. (550 ft.) also the 3rd district between South Anderson thru Peoria to Spring Grove yard(LE&S) and Creve Croeur(NYC). (525 ft.). Active staging at both ends of the St. Louis line and staging for the P&PU RR at Creve Croeur along with Spring Grove Yard supply the railroad with traffic. Eight passenger trains, and a assortment of freight extras (in CTC territory all trains run on signal indication regardless of superiority or class) are operated over the division. Operating positions include a 2 dispatchers, South Anderson yardmaster with a eastend, westend and a depot job switch engines at South Anderson yard, a yardmaster with a switch crew at Alton, IL., a footboard yardmasters at Peoria and Nathanburg plus eight to ten road crews. Operating sessions are 4 hours long not including a 30 minute break in the middle. Normal operating is 16 to 20 operators. The layout dimensions are 29 ft. by 65 ft. Stairs to the basement. The restroom is downstairs

The Lake Erie and Southern Railroad uses Digitrax’s control system with UT4R Radio throttles all locos with working lights and some sound. The LE&S is full CTC operation on the St. Louis District and the Peoria District.. The Dispatchers is located in a separate room containing the 2 US&S Centralized Traffic Control machines and communications are by block phones. The Peoria District also has the NYC operating with trackage rights on the LE&S from Mayfeild Jct. to Bridge Switch.

Upcoming Sessions

Legend

  • The session is not yet open for signups.
  • Sorry, this session is currently full. But you can get on the Wait List.
  • You are signed up! Prepare to Operate!

Photo Galleries

Under Construction

Loading...